
kNm Hydraulikk was awarded a contract in 2013 for the installation and maintenance of foundation bolts in the Lista wind farm.
There are 31 wind turbine foundations where gThe excavation work was carried out by Veidekke and the installation of the foundations was carried out by kNm Hydraulikk.
The turbines for the wind turbines were supplied by Siemens.
