kNm Hydraulikk

News

Green Energy and Bolt Drawing

Green Energy and Bolt Drawing

Accurate pre-tensioning of bolted connections requires a lot of expertise. kNm Hydraulics has been many companies' preferred partner in bolting for many years and our products have patented solutions that combine speed and accuracy. OUR COMPETENCE - YOUR...

kNm Hydraulics awarded contract for Lista Wind Farm

kNm Hydraulics awarded contract for Lista Wind Farm

kNm Hydraulikk was awarded a contract in 2013 for the installation and maintenance of foundation bolts in the Lista wind farm. This concerns 31 wind turbine foundations where the groundwork was carried out by Veidekke and the installation of the foundations was carried out by kNm Hydraulikk. The turbines...

Gazelle 2012

Gazelle 2012

kNm Hydraulikk named Gaselle 2012 In 2012, kNm Hydraulikk was named a Gaselle 2012. In order to become a Gaselle you need to have the following: Approved accounts Doubled your turnover in the course of 4 years Turnover of more than 1MNOK Overall positive operating...

kNm Safety Nut

kNm Safety Nut

kNm Hydraulikk introduserer kNm Safety Nut. kNm Safety Nut er en nyutviklet mutter til hjelp for å holde verktøyet på...